Use the pallet that makes the buying decision difficult

Choose a repeatable load that represents the problem you need to prevent. A tall stack with corners that have torn the wrap is more useful for a corner-failure trial than an easy, square pallet that has never failed. For more than one load family, record which one each trial qualifies. Keep the carton layout, stack height, pallet, edge protection and route stages attached to the record.

Buyers asking whether 20 µm can replace 23 µm are comparing complete outcomes: damage, load condition, line interruptions and film consumption. A pilot study on a simplified test load measured differences across films and wrapping conditions. Its results apply to the tested setup and are a reason to run your own comparison.

Run a like-for-like check before optimizing settings

  1. Log the approved baseline. Record roll code and lot, measured thickness, film width, wrapper and recipe, and the pattern at the base, middle and top. Preserve the current approved sample for the comparison.
  2. Write the acceptance gates first. Agree where and when to measure wrap containment, which holes or loose tails trigger a stop, how to judge carton damage or shift, and what storage and handling stages must pass. Define how repeated measurements will be recorded.
  3. Screen each candidate with matched settings where appropriate. Confirm settings are within approved equipment and film limits. Use comparable pallets and record tears, stops, loose tails and material consumed. If a candidate needs a different recipe, label it separately and log each change.
  4. Repeat the final recipe across representative rolls and loads. Track load and roll IDs. Alternate baseline and candidate runs where practical to reduce the influence of shift or line drift.

See the working stretch guide if the machine display, supplier TDS and measured film stretch use different definitions.

Record pass and hold decisions by criterion

GateRecord on both filmsReason to hold a candidate
WrappingFirst failure location, breaks, stops and material used during reworkRepeatable web break or unsatisfactory throughput under the proposed recipe
As wrappedContainment at marked heights and faces, tail attachment, corner cuts and carton deformationAny required point outside the agreed limits or product damage
After storage and handlingSame marked points and measurement method, visible shifting, loose wrap, damaged cartons and label conditionRequired checks fail or the intended condition was never tested
Production useTrial film mass per passing pallet, including film discarded in trial rejects and reworkNominal roll savings disappear at the tested recipe or the result is too variable to judge

Use the same measuring tool, method, face and height labels. Take readings on separate marked areas or matched pallets when an earlier reading disturbs the film. If a customer calls for a vibration test, agree the test method and use the required test setup.

Compare material use after both films pass

Calculate net film used per accepted pallet for each passing configuration, including film spent on failed wraps and rework. For example, if the 23 µm baseline uses 0.230 kg per accepted pallet, a 20 µm candidate would have to come in below 0.230 kg to reduce film mass for this load and recipe. Record any change in corner protection, interruptions or wrap count with the measurement.

A candidate that fails a gate stays on hold even if it uses less film. Once both configurations pass, use the cost-per-pallet worksheet to compare quotations on the same basis.

Approve the film and recipe together

Record the approved film grade and roll dimensions, accepted load family, exact wrap recipe, storage and handling conditions, and who signed off. If a 17 µm candidate fails at a corner, keep the record on hold and document its failure mode. If you add corner protection, create a separate comparison for that packaging configuration and include its cost.

Use the test plan and downloadable trial record to give purchasing and quality the same evidence. Include the next run or lot that will be checked before extending the approval to other loads.