Clarify supplied construction

Ask which construction details the supplier can document for the exact item code offered. If layer count, cling side or a designated outer surface is relevant to the application, put the supplier’s written description in the sample file. Mark a generic diagram as illustrative and keep it separate from the description of the supplied roll.

Choose outcome metrics

Packaging needSample-level checkLoad-level check
Cover exposed cornersSuitable puncture or tear comparison with documented conditionsRecord damage at representative corners and after handling.
Keep the film tail attachedVerify face orientation and compare the applicable film-to-film clingInspect the tail at wrapping and again after the agreed dwell.
Hold a defined loadCompare directional stretch data where relevantMeasure containment at agreed load positions and times.

Keep the film construction in the description and put the measurable outcomes, methods, limits and decision rules in the acceptance section.

Compare roll consistency

Assign an ID to each roll. Compare several rolls from the same lot and, where included in the validation scope, repeat with another lot. Track the measured thickness range, unwind interruptions and load observations by roll. A failed roll should stay identifiable in the results even when the overall mean passes.

Write a usable specification

  • Include finished width, nominal thickness and separately stated thickness tolerance.
  • Record agreed methods and acceptance criteria for the checks relevant to the load.
  • Keep supplier item, lot marking, winding direction and controlled document revision together.
  • Agree what changes to the grade, construction or roll format require notification or re-evaluation.

Use the thickness and tolerance guide to add the points and rules that the receiving team will use.